Search
Balance Utility Solutions is the EPC for the 5MW solar project.

Balance wins solar EPC contract

Welshpool-based Balance Utility Solutions has been selected as the engineering and construction contractor for Terregra Renewables’ five-megawatt Mobilong solar farm, located north of Murray Bridge in South Australia.

Login

(existing subscribers)

The password field is case sensitive.
Request new password

Comments

Bangalore, India
Well done, Balance!

Add your comment

Engineers

74th↓JDSI Consulting EngineersNFP
75th↑Intellect Systems20
76th-Balance Utility Solutions19
77th↓SGS Australia16
78th↑Deacon Engineers16
157 engineers ranked by number of engineers in WA

BNiQ Disclaimer