Welshpool-based Balance Utility Solutions has been selected as the engineering and construction contractor for Terregra Renewables’ five-megawatt Mobilong solar farm, located north of Murray Bridge in South Australia.

Welshpool-based Balance Utility Solutions has been selected as the engineering and construction contractor for Terregra Renewables’ five-megawatt Mobilong solar farm, located north of Murray Bridge in South Australia.